Under What Situation Shall Engineers Use Jacking At One End Only And From Both Ends In Prestressing Work? Sudheer Kumar Raju 13 Jun, 2012
What Is Sudheer Kumar Raju 13 Jun, 2012
In Incremental Launching Method Of Bridge Construction, What Are The Measures Adopted To Enhance Sufficient Resistance Of The Superstructure During The Launching Process? Sudheer Kumar Raju 13 Jun, 2012
In Bridge Widening Projects, The Method Of Stitching Is Normally Employed For Connecting Existing Deck To The New Deck. What Are The Problems Associated With This Method In Terms Of Shrinkage Of Concrete? Sudheer Kumar Raju 13 Jun, 2012
What Are The Advantages Of Assigning The Central Pier And The Abutment As Fixed Piers? Sudheer Kumar Raaju 13 Jun, 2012
Sometimes The Side Of Concrete Bridges Is Observed To Turn Black In Colour. What Is The Reason For This Phenomenon? Sudheer Kumar Raaju 13 Jun, 2012
In Prestressing Work, If More Than One Wire Or Strand Is Included In The Same Duct, Why Should All Wires/strands Be Stressed At The Same Time? Sudeer Kumar Raju 13 Jun, 2012
In The Design Of Elastomeric Bearings, Why Are Steel Plates Inserted Inside The Bearings? Sudheer Kumar Raju 13 Jun, 2012
How To Determine The Size Of Elastomeric Bearings? Sudheer Kumar Raju 13 Jun, 2012
In A Curved Prestressed Bridge, How Should The Guided Bearings In Piers Of The Curved Region Be Oriented With Respect To The Fixed Bearing In Abutment Sudheer Kumar Raju 13 Jun, 2012
In The Construction Of A Two-span Bridge (span Length = L) By Using Span-by-span Construction, Why Is A Length Of About 1.25L Bridge Segment Is Constructed In The First Phase Of Construction? Sudheer Kumar Raju 13 Jun, 2012